Header Image

Important Documents

Click on the links below to access the currently available documents.

Please note: To view these documents you may have to download the latest version of Acrobat Reader. Due to the nature of the documents, some of these files are a significant size and in some cases will take some time to download.

ENVIRONMENTAL ASSESSMENT REPORT
Executive Summary [PDF 2.3MB]
Part A:

Introduction [PDF 2.1MB]

Background [PDF 2.3MB]

Part B:

State significance of the CUB site [PDF 10.3MB]

SEPP Amendment Controls [PDF 0.2MB]

Local statutory Planning Framework [PDF 0.5MB]

Part C:

Site Analysis [PDF 12.9MB]

Part D: Part E: Part F:

Conclusion [PDF 0.1MB]


Appendices:
A1 Concept Plan drawings prepared by COX/ATA October 2006
BASEMENT EXTENTS CONCEPT PLAN - GFA ALLOCATION & RESIDENTIAL COMPONENT CONCEPT PLAN - STREET LAYOUT
CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 1 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 2 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 3
CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 4 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 5 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCKS 6 & 7
CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 8 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 9 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 10
CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - BLOCK 11 CONCEPT PLAN ENVELOPES, ISOMETRIC VIEWS - PARK
ELEVATIONS 01 & 02 ELEVATION 03 ELEVATION 04
ELEVATION 05 ELEVATION 06 ELEVATION 07
ELEVATION 08 ELEVATIONS 09 & 10 ELEVATIONS 11 & 12
ELEVATION 13 ELEVATION 14 ELEVATION 15
ELEVATION 16 ELEVATIONS 17 & 18 ELEVATIONS 19 & 20
INDICATIVE STAGING PLAN (NOT FOR APPROVAL) KEY PLAN LANE SECTIONS
PRINCIPAL GROUND FLOOR USES AND ACTIVATION PLAN PUBLIC DOMAIN PLAN PUBLIC PARKING PROVISION
ROOF PLAN SECTION AA SECTION BB
SECTIONS CC & DD & EE SECTIONS FF & GG & HH & II SECTIONS JJ & KK & LL
SECTIONS MM & NN & OO & PP STREET SECTIONS, SHEET 01 STREET SECTIONS, SHEET 02
STREET AWNING EXTENTS TYPICAL UPPER FLOOR PLAN
A2 Site Planning drawings prepared by COX/ATA October 2006
CP_02_A-01-01_04 CP_02_A-01-02_04 CP_02_A-03-01_04
CP_02_A-04-01_04 CP_02_A-04-02_04
A3 Context drawings prepared by COX/ATA October 2006
CP_01_A-02-01_04 CP_01_A-02-03_04 CP_01_A-03-01_04
CP_01_A-03-02_04 CP_01_A-03-03_04 CP_01_A-04-01_04
CP_01_A-05-01_04 CP_01_A-06-01_04 CP_01_A-06-02_04
CP_01_A-06-03_04 CP_01_A-06-04_04
A4 Supporting Material drawings prepared by COX/ATA October 2006
CP_05_A-01-01_04 CP_05_A-01-02_04 CP_05_A-01-03_04
CP_05_A-01-04_04 CP_05_A-02-01_04 CP_05_A-02-02_04
CP_05_A-03-01_04 CP_05_A-03-02_04 CP_05_A-03-03_04
CP_05_A-03-04_04 CP_05_A-04-01_04 CP_05_A-04-02_04
A5 Indicative Perspective Sketches and Photomontages prepared by COX/ATA October 2006
Photomontage — View from Railway Square Artist Impression — Tooth Avenue Artist Impression — Chippen Lane looking south
Artist Impression — View from Blackfriars Street to Irving Street Artist Impression — View from SE corner to Kent Road and Kensington Street
A6 Landscape Design Statement and plans prepared by Sue Barnsley Design September 2006
Landscape ELEVATION 03 Landscape PLAN Landscape SECTION A
Landscape SECTION C A6 Landscape Report - Sue Barnsley Design
B Survey Plans prepared by Degotardi Smith & Partners July 2006
Surveyor's Report Part 1 Surveyor's Report Part 2 Title Summary
C Land Owners' Consent Letters
Land Owners Consent Letter Letter from Energy Australia
D Draft and Final Director General Requirements dated 4 October 2006
Draft DGRs 11 July 2006 Final DGRs 4 October 2006
E Authorities and Agencies Consultation Table
F Community and Stakeholder Consultation Overview prepared by Elton Consulting October 2006 [PDF 86KB]
G Review of Social Aspects prepared by P/P/M Consultants in association with Elton Consulting October 2006 [PDF 127KB]
H Focus Group November 2005 Report prepared by Urbis Keys Young November 2005 [PDF 608KB]
I Minister's Orders of the 23 June 2006 and 21 July 2006
Ministers Order 21 July 2006 Ministers Order 23 June 2006
J Draft SEPP Amendment
01 CUB Site Zoning Map 02 CUB Site Height Map 1 03 CUB Site Height Map 2
04 CUB Site GFA Map 05 CUB Site Heritage Map Draft SEPP Amendment Text
K Expert Advisory Panel Report August 2006 [PDF 66KB]
L Remediation Strategy for Stage 1 Development Application - Kent Brewery Site prepared by URS Australia Pty Ltd October/ August 2006 [PDF 161KB]
 
Figure 1 Figure 2 Figure 3
Figure 4 Figure 5 Figure 6
Figure 7 Figure 8 Figure 9
Figure 10 Figure 11 Figure 12
M Transport Report prepared by Masson Wilson Twiney Pty Ltd September 2006
Transport Report - Masson Wilson Twiney - Part 1 Transport Report - Masson Wilson Twiney - Part 2
N Geotechnical Investigations for Kent Brewery Site prepared by URS October 2006
Geotechnical-Appendix-A Geotechnical-Appendix-B-Part-1 Geotechnical-Appendix-B-Part-2
Geotechnical-Appendix-B-Part-3 Geotechnical-Appendix-B-Part-4 Geotechnical-Appendix-C-D-E
Geotechnical-Appendix-F Geotechnical-Appendix-G-part-1 Geotechnical-Appendix-G-part-2
Geotechnical-Part-1-Figures-1 Geotechnical-Part-1-Figures-2 Geotechnical-Part-1-Figures-3
Geotechnical-Part-1-Figures-4 Geotechnical-Part-1-Figures-5 Geotechnical-Part-1-Figures-6
Geotechnical-Part-1-Figures-7 Geotechnical-Part-1-Figures-8 Geotechnical-Part-1-Figures-9
Geotechnical-Part-1
O CUB Site - Structural Report prepared by Ove Arup Pty Ltd October 2006 [PDF 43KB]
P Infrastructure Report for Kent Brewery Redevelopment prepared by Robert Bird Group Pty Ltd October 2006
Infrastructure Report - Robert Bird Group SKC000 COVER SHEET LOCATION PLAN AND DRAWING LIST SKC100 GENERAL ARRANGEMENT - SHEET 1 OF 5
SKC101 GENERAL ARRANGEMENT - SHEET 2 OF 5 SKC102 GENERAL ARRANGEMENT - SHEET 3 OF 5 SKC103 GENERAL ARRANGEMENT - SHEET 4 OF 5
SKC104 GENERAL ARRANGEMENT - SHEET 5 OF 5 SKC140 PAVEMENT GRADING PLAN SKC150 COMBINED SERVICES PLAN - SHEET 1 OF 5
SKC151 COMBINED SERVICES PLAN - SHEET 2 OF 5 SKC152 COMBINED SERVICES PLAN - SHEET 3 OF 5 SKC153 COMBINED SERVICES PLAN - SHEET 4 OF 5
SKC154 COMBINED SERVICES PLAN - SHEET 5 OF 5 SKC200 ROAD TYPICAL SECTIONS SKC210 ROAD LONG SECTIONS - ALIGNMENT 1 (Carlton St)
SKC211 ROAD LONG SECTIONS - ROAD 2 (Balfour St) SKC212 ROAD LONG SECTIONS - ALIGNMENT 3 (Chippen Lane) SKC213 ROAD LONG SECTIONS - ROAD 4 ( Kent Road)
SKC214 ROAD LONG SECTIONS - ROAD 5 (Kensington St & Kent Rd) SKC215 ROAD LONG SECTIONS - ROAD 6 (Tooth Avenue) Ch 00-160 SKC216 ROAD LONG SECTIONS - ROAD 6 (Tooth Avenue) Ch 160-262
SKC217 ROAD LONG SECTIONS - ROAD 7 (Irving St) Ch 00-160 SKC218 ROAD LONG SECTIONS - ROAD 7 (Irving St) Ch 160-264.19 SKC219 ROAD LONG SECTIONS - ROAD 8 (O'Connor St)
SKC301 STORMWATER DRAINAGE PLAN - SHEET 1 OF 2 SKC302 STORMWATER DRAINAGE PLAN - SHEET 2 OF 2 SKC370 STORMWATER CATCHMENT PLAN
SKC371 BLACKWATTLE BAY SWC17 CATCHMENT PLAN SKC401 SEWER RETICULATION PLAN - SHEET 1 OF 2 SKC402 SEWER RETICULATION PLAN - SHEET 2 OF 2
SKC501 WATER RETICULATION PLAN - SHEET 1 OF 2 SKC502 WATER RETICULATION PLAN - SHEET 2 OF 2 SKC610 ELECTRICAL SERVICES PLAN - SHEET 1 OF 2
SKC611 ELECTRICAL SERVICES PLAN - SHEET 2 OF 2 SKC620 GAS RETICULATION PLAN - SHEET 1 OF 2 SKC621 GAS RETICULATION PLAN - SHEET 2 OF 2
SKC630 TELECOMMUNICATION SERVICES PLAN - SHEET 1 OF 2 SKC631 TELECOMMUNICATION SERVICES PLAN - SHEET 2 OF 2
Q Competition Brief Document fro the former CUB Site prepared by Hill Thalis Architecture and Urban Design Pty Ltd
Competition Brief Document - Hills Thasis Urban Design Part 1 Competition Brief Document - Hills Thasis Urban Design-2 Part 2
R Design Competition Jury Report June 2004 [PDF 233KB]
S Heritage Impact Assessment prepared by Godden Mackay Logan Pty Ltd October 2006
S Kent Brewery HIS (Final, October 2006) Part 1 S Kent Brewery HIS (Final, October 2006) Part 2 S Kent Brewery HIS (Final, October 2006) Part 3
S Kent Brewery HIS (Final, October 2006) Part 4 S Kent Brewery HIS (Final, October 2006) Part 5 S Kent Brewery HIS (Final, October 2006) Part 6
S Kent Brewery HIS (Final, October 2006) Part 7 S Kent Brewery HIS (Final, October 2006) Part 8 S Kent Brewery HIS (Final, October 2006) Part 9
T Water Sensitive Urban Design Strategy prepared by Ecological Engineering Pty Ltd September 2006 [PDF 1.7MB]
U ESD Strategies Report prepared by Ove Arup Pty Ltd October 2006 [PDF 325KB]
V Shadow Studies prepared by JM Modelling October 2006
June 22nd - 10am June 22nd - 11am June 22nd - 12pm
June 22nd - 1pm June 22nd - 2pm June 22nd - 3pm
June 22nd - 9am March 21st - 10am March 21st - 11am
March 21st - 12 noon March 21st - 1pm March 21st - 2pm
March 21st - 3pm March 21st - 9am
W Environmental Assessment - Wind, Acoustics and Daylighting prepared by Heggies Australia Pty Ltd October 2006
X 'Sunlight Access to Apartments for Residential Amenity - A discussion on planning Controls and their practical application' prepared by COX/ATA November 2005 [PDF 325KB]
Y Peer Review of the Extent of Solar Access prepared by Heggies Australia Pty Ltd 2006
Z Concept Plan Application Review and Strategy for Provision of Access for People with a Disability prepared by Access Associates Sydney August 2006 [PDF 82KB]
AA Preliminary CPTED Report prepared by Elton Consulting September 2006 [PDF 855KB]
BB Review of Economic Impact Issues prepared by Strategic Economic Solutions Pty Ltd in association with Elton Consulting October 2006 [PDF 133KB]
CC Preliminary Market Assessment prepared by Dimasi for BC Associates July 2006 [PDF 2MB]
DD Letter regarding the remediation of the site October 2006 [PDF 56KB]
EE Letter regarding retail carparking requirements - BC Associates October 2006 [PDF 21KB]
FF Draft Statement of Commitments [PDF 78KB]
GG Draft Voluntary Planning Agreements
Draft Voluntary Planning Agreement - Minister for Planning Draft Voluntary Planning Agreement - Redfern-Waterloo Authority Explanatory Note - Draft Planning Agreement - Minister for Planning
Letter to Minister

Other Documents:

Major Projects Application [PDF 0.7MB]